How it usually works
What fits school painting into the break.
“It has to be done during the break.”
Timed to the calendar
School painting is timed to the school year, mostly the summer and the shorter winter and spring breaks.
“The summer keeps getting shorter.”
Booked by spring
The summer window gets shorter every year, so school work is usually booked by spring.
“It has to be finished before they’re back.”
Signed off before students return
The job has to be finished and signed off before students return, so the plan works back from that date.
“Will it smell on the first day?”
Fumes and fresh air
Most paints give off fumes as they dry. Product choice and moving fumes outdoors matter most, because heating and air conditioning mostly recirculate the air.
What can be refreshed
Lockers, doors and metal furniture can usually be refreshed, not replaced.
Worn metal in a school can usually be refinished in place, in a new colour, over a short break.
Done before
Done in a school.
A hallway of lockers, refinished over the winter break. It opens the full story.
Still weighing it up?
Call and ask how the work would fit your break.
If another system suits the job better, we’ll say so.