Refinish or replace?
Replacing is what most people know. Refinishing skips the removal and the wait.
“Replacing them costs a fortune.”
Nothing to remove
Metal can usually be refinished where it stands, so there's no removal and no wait for new units.
“They don't match anymore.”
A new color, if you want one
Refinishing can change the color, so items that no longer match end up matching.
“What is electrostatic, anyway?”
How it works
The spray gun charges the paint so it's drawn onto grounded metal, wrapping around edges for an even coat. More paint lands on the metal, so there's less overspray to control.
“Is this even the right fix?”
Straight advice
It works on metal that can be grounded. Deep recesses coat poorly, and an item that has failed, with broken hinges or a body coming apart, may be better replaced.
Will it work on ours?
Lockers, doors, cabinets, cases and frames.
Six jobs we've refinished electrostatically. Each one opens the full story.

High school
School hallway lockers, Bernardsville, NJ
Done over the winter break, while school was out

Occupied commercial building
Elevator doors, Edison, NJ
Done in off hours, in a building that stayed occupied

Working supermarket
Supermarket refrigeration cases, North Brunswick, NJ
Store stayed open; cases ready for use the next morning

Working office
Office filing cabinets, Farmingdale, NJ
Office kept working; done over a weekend in a booth built on site

Bank branch
Bank teller-line cabinets, Middletown, NJ
Counters back in use the same afternoon

Office building entrance
Office building storefront, Parsippany, NJ
Dated brass entrance updated without replacing the doors
Do we have to close?
Usually not. Work can be done overnight, off-hours or one area at a time.
Here's how it went in four buildings that stayed open.
1 night
Supermarket cases, North Brunswick
Product left in the cases under plastic, and the cases ready for use the next day.
Same day
Teller-line cabinets, Middletown
Sprayed in place, with the counters back in use the same afternoon.
2 nights
Filing cabinets, Farmingdale
Refinished over a weekend in a plastic booth built around them in the office.
2 days
School lockers, Bernardsville
Done over two days between Christmas and New Year.
What about the mess?
Anything that isn't being painted is covered or masked first.
Real photos from the middle of four jobs.

Step 1 · Cover
Ceiling tented, floor covered
Bernardsville: the hallway ceiling tented in plastic and the floor covered before the lockers were sprayed.

Step 2 · Mask
Mask what stays
Edison: the floor papered and the door frames and walls masked around the elevator doors.

Step 3 · Contain
A booth where needed
Farmingdale: a plastic spray booth built around the filing cabinets in a working office.

Step 4 · Back in use
Plastic off, back to work
Middletown: the teller drawers refinished black, the pulls left unpainted.
Still weighing it up?
Call and ask about timing, smell or your building.