
Before

During
Before
Three electronic filing cabinets with internal roller systems, in a working office in Farmingdale, New Jersey. The fronts were blue.
Keeping the building running
Two nights over a weekend, outside office hours.
How it was done
Cleaned the cabinets with acetone.
Built a plastic spray booth on site, with everything around it covered.
Sprayed the fronts electrostatically with PPG Breakthrough.
After
Dark bronze cabinet fronts, done in two nights with two people. The customer was very happy.
At a glance
Building
Working office
Where
Farmingdale, NJ
Work
Electrostatic painting
When
Two nights over a weekend
Our work
More jobs in buildings that stayed open.

High school
School hallway lockers, Bernardsville, NJ
Done over the winter break, while school was out

Occupied commercial building
Elevator doors, Edison, NJ
Done in off hours, in a building that stayed occupied

Retail store
Split-face block wall, Cherry Hill, NJ
Repainted to match the store’s own sign colors
